Cabero J, Baillo A, Cerisola S, Ventosa M, Garcia-Alcalde A, Peran F, Relano G (2005) A medium-term integrated threat management model for a hydrothermal generation company. IEEE Trans Energy Syst 20(3):1379–1388. doi:CrossRef
Candelliere A, Giuliano G, Nicolosi V, Tossi G (2003) Optimal short term procedure of a multipurpose reservoir system under limited water-supply. In: Blöschl G, Franks S, Kumagai M, Musiake K, Rosbjerg D (eds) Water sources system-hydrological threat, administration and development, IAHS Publication No. 281, Wallingford, U.K., pp 200–207
Chen S-L (2001) Study of standard ideas and automation system of reservoir team. Dissertation, Wuhan University, Wuhan, Asia
Cheng C-T, Wang B-D, Chen S-Y, Tan P-L, Gu N-C, Zhong Z-Y (1997) Fuzzy optimal model the flooding control system of top and middle reaches associated with the Yangtze River. J Hydraul Eng (2):72–76
Cheng C-T, Wang W-C, Xu D-M, Chau K-W (2008) Optimizing hydropower reservoir procedure using hybrid hereditary algorithm and chaos. Liquid Resour Handle 22(7):895–909. doi:
Conejo AJ, Arroyo JM, Contreras J, Villamor FA (2002) Self-scheduling of a hydro producer in a pool-based electrical energy marketplace. IEEE Trans Power Syst 17(4):1265–1272. doi:
Huang Y-H, Shang J-C, Kang C-Q, Xia Q, Meng Y-J, He N-Q (2003) Operation process and different types of day-ago deal market of electric power. Autom Electric Power Syst 27(3):23–27
Li J-Q, Zhang Y-S, Wang L-P, Ji C-M (2005) learn on energy generation danger dispatching of hydropower station under market environment. J Hydroelectric Eng 78(5):1–4
Li J-Q, Zhang Y-S, Wang L-P, Ji C-M (2006) Mid-and-long-term danger dispatching of hydropower system predicated on set-pair analysis concept. J Asia Hydrol 26(4):21–26
Lund JR, Guzman J (1999) Some derived working principles for reservoirs in series or in parallel. J Water Resour Plann Manag-ASCE 125(3):143–153
Mei Y-D, Zhu J-X (2000) Short-term ideal procedure model the cascade hydroelectric programs on the top Yellow River and its own option. J Hydroelectric Eng 69(2):1–7
Rafal W (2000) Energy cost danger administration. Physica A: Statistical Mechanics and its own Applications 285(1–2):127–134
Scott T-J, Read E-G (1996) Modeling hydro reservoir operation in a deregulated electricity marketplace. Int Trans Opt Res 3(3):243–253. doi:
Shawwash ZK, Siu T, Russell SO (2001) The B. C. hydro short-term scheduling optimization model. IEEE Trans Power Syst 15(3):1125–1131. doi:
Wang Y-M (2002) Open up a prospect for hydropower dispatching. Hydropower Autom Dam Monit 26(3):1–3
Wang J-W, Fan X-H, Zhang Y-C, Zhang S-Q, Yue Y-H (2003a) Maximal electricity style of temporary peak regulation of large scale hydropower system and its own Solution. Autom Electrical Power Syst 27(15):29–34
Wang Z, Lei X-M, Zhou S-X, Chen X-Q, Pei Z-Y, Shu Y-B, He G-Y (2003b) Optimal dispatch system and algorithm of three gorges energy marketplace. Autom Energy Syst 27(6):42–46
Yuksek O, Komurcu MI, Yuksel I, Kaygusuz K (2006) Hydroelectric energy: a key possible in meeting the long run electric power demand of Turkey. J Energy Plan 34(17):3093–30103. doi:
Yüksel I (2007) growth of hydropower: an instance research in developing countries. Journal of Energy Sources, Role B Econ Plann Plan 2(2):113–121
Yüksel we (2008) Hydropower in chicken for on a clean and renewable power future. Renew Sustain Energ Rev 12(6):1622–1640
Zambelli M, Siqueira TG, Cicogna M, Soares S (2006) Deterministic versus stochastic models for very long term hydrothermal scheduling. In: Procedures of energy engineering culture, 2006 IEEE basic conference, Montreal, Canada, 18–22 June 2006
Zhang Y-G (1994) Day optimization operation of hydropower plant team in energy system. Huazhong Univ. of Science & Tech Press, Wuhan, China
Zhang Y-S (2004) learn on principle and application to the cost-effective operation of hydropower in electrical energy marketplace. Dissertation, Wuhan University, Wuhan, Asia
Zhao Y-L, Chang X-Q (2003) learn of hydropower dispatch in energy marketplace context. Asia Energy 33(11):62–64
Zhao Z-L, Xin Y-Z, Guo G-C (eds) (2001) procedure system of energy marketplace, Asia electrical power Press, Beijing, China
Zhu C-J, Zhou J-Z, Yang J-J, Wu W (2006) optimum scheduling of hydropower plant with anxiety power cost risks. In: Proceedings of 2006 int. conf. on energy system technology, Chongqing, China, 22–26 Oct 2006